Contract intelligence for construction and infrastructure

Infiny reads the contracts, letters, and programmes on your project. Track each notice and time bar, draft replies in minutes, and prove delay with the page behind every fact.

Project Brain›
Across the Particular Conditions and the Section A1 correspondence: when was full land handover due and when did it happen? Was VCON’s notice inside the Sub-Clause 20.1 window, and what are we claiming? Can the Employer levy delay damages yet, and what does the Engineer’s slow-progress notice require from us?
Reading the project record

Used by contractors, PSUs, and their advisers

AKS Partners logo
Dedicated Freight Corridor logo
Evident logo
DMRC logo
Jakson Group logo
Jinfra logo
Texmaco logo
Nippon KOEI India logo

The problem

One missed notice can sink a valid claim.

A large package produces tens of thousands of letters, diaries, minutes, and programme updates. The facts that decide entitlement are scattered across them, and the people who knew where to look have often moved on by the time the claim is assessed.

Missed time bars

Missed time bars

Every contract and subcontract sets its own notice periods. Miss one by a day and a valid claim can be rejected outright.

Scattered evidence

Scattered evidence

Proving one delay event takes the instruction, the site diary, the notice, and the programme update. They are usually filed in four different places.

Senior time spent searching

Senior time spent searching

Planning engineers and contract managers spend days tracing documents and drafting routine replies instead of running the project.

Every format

If it's on the project, Infiny reads it.

Contracts in PDF, letters in Word, handwritten site diaries, programmes in Excel, drawings in DWG, and models in IFC. Infiny reads what each file says, so you find documents by their content, whatever they were named.

  • Whole archives

    Upload folders and zip files. Years of correspondence go in at once.

  • Scans & handwriting

    Scanned letters, site diaries, and marked-up drawings are read with OCR, handwriting included.

  • Drawings & models

    Plans, sections, and BIM elements become records you can ask about and cite.

  • Cl. 20.1 · 28-day notice

    PDF

    .pdf

  • Word

    .docx · .doc

  • Handwritten

    diaries · markups

  • Unstructured

    emails · photos · scans

  • Tables

    inside any document

  • Excel

    .xlsx · .csv

  • PowerPoint

    .pptx

  • DWG

    .dwg

  • CAD

    plans · sections

  • 3D BIM

    .ifc

Who it's for

Built for both sides of the contract.

Contractors, PSUs, Engineers, and delay and quantum experts all work from the same contract and the same project record. Infiny gives each of them the facts, with the source attached.

  • Contractors & EPC firms

    Give notice on time and protect your entitlement to time and money.

  • PSUs & employers

    Assess EOT and cost claims against the contract and the site record.

  • Engineers & PMCs

    Administer the contract and support determinations with the record.

  • Delay & quantum experts

    Build chronologies and delay analyses from source documents.

  • Lawyers & arbitrators

    Prepare pleadings and evidence with every fact traced to its source.

  • Rail & metro

    Multi-package corridors and metro lines where interface delays and possession blocks build into claims over years of letters.

    Explore rail & metro
    • FIDIC
    • DFC
    • Metro GCC
  • Roads & highways

    EPC, HAM, and item-rate packages with milestone payments, damages, and steady correspondence with the Authority.

    • MoRTH EPC
    • NHAI HAM
    • FIDIC
  • Energy & industrial EPC

    Plants and process works with vendor packages, performance guarantees, and back-to-back subcontracts.

    • FIDIC Silver
    • LSTK
    • NEC4
  • Buildings & urban infra

    Public buildings, water, and urban works where BOQ quantities, variations, and extensions decide the margin.

    • CPWD GCC
    • PWD
    • JCT

Customers

What railway PSUs, law firms, and arbitrators say about Infiny.

DFCCIL
We can now map an entire chronology across thousands of pages in minutes. It moved our workflow from searching for facts to strategising around them.
Akshay Kaushal

Akshay Kaushal

DFCCIL

AKS Partners
Finding specific clauses or historical dates is now instantaneous. Reviewing voluminous documents is faster, clearer, and far less cumbersome.
Ayan K. De

Ayan K. De

Partner · AKS Partners

Legacy Law Offices
Infiny helps us prepare high-quality first drafts of complex arbitration documents with greater speed, consistency, and precision.
Vandana Randhawa

Vandana Randhawa

Director · Legacy Law Offices

Empanelled Arbitrator

Faster cross-referencing of provisions, pleadings, and evidence lets me focus less on searching and more on reasoning.
Chahatey Ram

Chahatey Ram

Ex. DRM Railways · Empanelled Arbitrator

Security

ISO 27001 certified, with every client's data kept separate.

Contracts, claims, and correspondence are commercially sensitive. Infiny keeps them private, isolated, and auditable. We do not train models on your files or sessions.

Delay_Notice_19Mar.pdf
AES-256 protected

NOTICE OF DELAY · DN/M14/014

Site Access Instruction, 14 March 2025

Critical path A1020 → A1410

Extension of time requested: 14 days

Meridian Construction Ltd

In transit
At rest · AES-256
ISO 27001Information security certified

No model training

Your files and sessions are not used to train models.

Tenant isolation

Each client's data is segregated by tenant.

FAQ

Questions teams ask before they start.

Didn't find your question?

Ask the team on a call

Know every contract inside out
Book a demo to see Infiny on documents like yours.
BOOK A DEMO
© 2026 North Star Intellisoft Pvt. Limited
infiny