Rail & metro

Every rail and metro package, read as one record.

Civil, track, systems, and rolling stock packages run on different contracts with different contractors. Infiny reads all of them, with the letters and programmes between them, so you can trace an interface delay from one package to the next.

Book a demo

Used by

  • DFCCIL logo
  • DMRC logo
  • Texmaco logo
  • Sub-Clause 20.1 notice · due in 6 days
  • Interface event IE-14 · civil → track
  • Hindrance register · 41 days logged

The challenge

Where rail & metro programmes lose time and money.

  1. 01

    Interfaces between packages

    A late formation handover on the civil package becomes a track delay, then a systems delay. Each contractor holds a different piece of the story.

  2. 02

    Records that span a decade

    Corridors and metro lines run for years. By the time a claim is assessed, the people who wrote the letters have often moved on.

  3. 03

    Access, blocks, and possessions

    Land handover, traffic blocks, and utility diversions decide entitlement, and the proof usually sits in hindrance registers and site diaries.

Contracts & documents

Built for the forms rail & metro runs on.

Infiny reads the contract and the project record together. It knows where each form sets notices, time bars, and entitlement, and it finds the facts that trigger them.

Contract forms

  • FIDIC Red, Yellow & Silver

    1999 and 2017 editions, including the MDB Harmonised Edition used on multilateral-funded corridors.

  • Indian Railways GCC

    General Conditions of Contract with the special conditions and correction slips.

  • Metro GCC & SCC

    General and special conditions issued by metro rail corporations.

  • EPC agreements

    Lump-sum EPC packages from railway PSUs and state rail bodies.

  • Subcontracts

    Back-to-back terms, so notices, LDs, and variations pass through correctly.

Project records

  • Notices & claims
  • Engineer's determinations
  • Hindrance registers
  • Traffic block & possession records
  • Interface minutes
  • Design submissions & RFIs
  • NCRs & inspection records
  • IPCs & variation orders
  • Baseline & updated programmes
  • Alignment & GA drawings
  • Site diaries
  • Authority correspondence
See every file format Infiny reads

Customers

Used on freight corridors and metro lines.

“We can now map an entire chronology across thousands of pages in minutes. It moved our workflow from searching for facts to strategising around them.”

Akshay Kaushal

DFCCIL

“Faster cross-referencing of provisions, pleadings, and evidence lets me focus less on searching and more on reasoning.”
Chahatey Ram · Ex. DRM Railways · Empanelled Arbitrator

Teams on Infiny

  • DFCCIL logo
  • DMRC logo
  • Texmaco logo

FAQ

Questions from rail & metro teams.

Know every contract inside out
Book a demo to see Infiny on documents like yours.
BOOK A DEMO
© 2026 North Star Intellisoft Pvt. Limited
infiny