Letters & replies

AI drafting for contract letters and notices, cited to the record.

Upload the letter you received. Infiny finds the relevant clause and the earlier correspondence, then drafts the reply in your template.

Book a demo

Used by contractors, PSUs, and their advisers

AKS Partners logoDedicated Freight Corridor logoEvident logoDMRC logoJakson Group logoJinfra logoTexmaco logoNippon KOEI India logo
AKS Partners logoDedicated Freight Corridor logoEvident logoDMRC logoJakson Group logoJinfra logoTexmaco logoNippon KOEI India logo
AKS Partners logoDedicated Freight Corridor logoEvident logoDMRC logoJakson Group logoJinfra logoTexmaco logoNippon KOEI India logo
AKS Partners logoDedicated Freight Corridor logoEvident logoDMRC logoJakson Group logoJinfra logoTexmaco logoNippon KOEI India logo
Correspondence›

Points to answer

1. Time bar
Sub-Clause 20.1 · 28 daysSite Access Instruction · 14 MarDelay Notice DN/M14/014 · 19 Mar
2. Critical path
Baseline_Rev_3.xerA1020 → A1410 · 0d floatUpdate · 14-day slip
3. Particulars
Sub-Clause 20.1 · 42 daysDue 25 Apr 2025
Reply · firm letter templateReady to review · 1:52

Meridian Construction Ltd

Our ref: MCL/ENG/231

2 April 2025

Your ref: ENG/L/112

EPC Package Works

Re: Your letter ENG/L/112, extension of time for Milestone M-14

We respond to each point in your letter of 28 March 2025.

1. Notice was given in time. The Site Access Instruction was issued on 14 March 2025 and our Delay Notice DN/M14/014 followed on 19 March 2025, five days later and well within the 28 days allowed by Sub-Clause 20.1.

2. The restriction sits on the critical path. Baseline_Rev_3 shows activities A1020, A1180 and A1410 with zero float, and the updated programme shows a 14-day slip to Milestone M-14.

3. The 42-day period for fully detailed particulars under Sub-Clause 20.1 does not expire until 25 April 2025. We will submit them within that period.

We therefore ask the Engineer to withdraw the rejection and proceed to a determination under Sub-Clause 3.5.

How it works

From the Engineer · ENG/MER/0217

Re: Extension of time claim, Milestone M-14

…notice was not given within 28 days. The claim is time-barred.
…did not affect the critical path.
…no detailed particulars have been submitted.
3 points to answerReply due 16 Apr

Step 1

Drop in the letter

Upload the letter you received. Infiny picks out each point you need to answer and when the reply is due.

Evidence found

Contract

Sub-Clause 20.1 · 28-day notice

Your letter

Delay Notice DN/M14/014 · 19 Mar

Programme

Baseline_Rev_3 · A1020 → A1410, 0d float

Step 2

Infiny finds the evidence

For each point, Infiny finds the clause, your earlier letters, and the programme entries that answer it.

MERIDIAN INFRAMER/ENG/0231 · 4 April 2025

1. Notice was given in time

The Site Access Instruction was issued on 14 March 20251 and our Delay Notice DN/M14/014 followed on 19 March 20252, well within the 28 days allowed by Sub-Clause 20.13.

Export to Word

Step 3

Reply in your template

The draft opens on your letterhead, with a source behind every statement. Edit it, then export to Word.

Style Map

Drafts that sound like your team

Upload two letters your team is proud of. Infiny maps how you write, from tone and numbering to the phrases you always reach for, and every reply follows it.

  • Learns from your own Word documents
  • Tone, structure, dates, and citation habits
  • Used for every reply and notice you draft
Reply to EOT rejection.docxNotice of claim.docx

Your style profile

ToneFirm, measured
VoiceThird person, “the Contractor”
Dates14 March 2025
Numbering1, 1.1, (a)
Signature phrase“without prejudice to its rights under”

Generic draft

We disagree with your assessment of our claim.

In your style

The Contractor does not accept the Engineer’s assessment and writes without prejudice to its rights under the Contract.

Know every contract inside out
Book a demo to see Infiny on documents like yours.
BOOK A DEMO