AI for construction and infrastructure projects, sourced to the page.
Ask about the contract, the programme, costs, drawings, or case law in plain language. Infiny routes the question to the right specialist agents, reads the relevant documents, and answers with a page reference for every fact.
Across the Particular Conditions and the Section A1 correspondence: when was full land handover due and when did it happen? Was VCON’s notice inside the Sub-Clause 20.1 window, and what are we claiming? Can the Employer levy delay damages yet, and what does the Engineer’s slow-progress notice require from us?
Short answer: the land notice was valid and delay damages are blocked for now, but the Engineer’s recovery demand needs a reply within 14 days.
1.
Handover. Full encumbrance-free possession of Section A1 was due on 05-Dec-2016and was only confirmed on 18-Feb-2017, 75 days late. Partial access before then does not count: fragmented access that does not enable the planned operation is not full handover.
2.
Notice. VCON’s notice LAND-001 is dated 02-Jan-2017, within 28 days of the missed milestone. That is enough under Sub-Clause 20.1, which only needs the event, the clause basis and the likely effect.
3.
The claim. A 75-day extension of time and INR 22.00 Crore in prolongation cost, supported by a time-impact analysis at the 05-Dec-2016 status point.
4.
Delay damages. The rate is INR 2.5 Crore a day, capped at INR 500 Crore, but none can be levied until the pending EOT claim is determined.
5.
Slow progress. The Engineer records 32% actual progress against 45% plannedand argues the slippage started before the land milestone. Expect that point to be used against concurrency, so it needs an answer.
Recommended next stepSubmit the recovery programme within 14 days with a 31-Jan-2017 data date, and split land-constrained from available fronts as the Engineer asks. That keeps the land delay visible while showing progress where work was possible.
How it works
Project record
Every page read
PDF
Contracts
Particular_Conditions
DOCX
Letters
EOT_Notice_Land_Delay
XLSX
Ledgers
Prolongation_Costs
XER
Programmes
Update_Jan2017
DWG
CAD drawings
A1_Bridge_GAD
IFC
3D BIM
A1_Viaduct_Model
Step 1
Bring every document
Upload contracts, letters, programmes, cost ledgers, CAD drawings, and 3D BIM models. Infiny reads every format.
Was our Section A1 land notice in time, and can the Employer levy delay damages yet?
Agents on this question
ContractsChronologyFactsQuantumDrawings
Reading 4 documents · 27 pages
Step 2
Ask in plain language
Ask the way you would ask a colleague. Infiny sends the question to the specialist agents it needs.
Yes, the notice was in time. Handover was due on 05-Dec-20161 and our notice followed on 02-Jan-20172, inside the 28 days of Sub-Clause 20.13. No delay damages can be levied until the EOT claim is determined4.
Save as memoMake a deckExport to Word
Step 3
Get a sourced answer
Every line cites the page it came from. Save it as a memo, turn it into a deck, or export to Word.
One assistant, every specialist
Each agent knows its kind of document, from contracts and P6 programmes to CAD drawings and 3D BIM models. Ask one question and they work on it together, then hand you a memo, a table, or a deck.
Contracts
“List every notice obligation across the head contract and subcontracts.”
PDFDOCX
Programme
“What slipped on the critical path since the baseline?”
XER
Quantum
“Reconcile the prolongation ledger and flag entries without backup.”
XLSX
Drawings & BIM
“Which drawings show the Section A1 bridge piers, and do they match the approved GAD?”
DWGIFCPDF
Chronology
“Build a dated chronology of the Section A1 land handover.”
PDFDOCX
Facts
“When was the Engineer first told the piling fronts were unavailable?”
PDFDOCXXLSX
Case law
“Find Supreme Court authority on time being of the essence.”
Judgments and statutes
Presentations
“Turn the A1 delay findings into a six-slide deck for the board.”
CreatesPPTX
Connect the drive once. Every new file is read on arrival.
Point Infiny at the project's SharePoint, OneDrive, or Google Drive. New and changed files sync automatically and are read before anyone asks, so answers reflect the latest letter.
SharePointAuto-sync
OneDriveAuto-sync
Google DriveAuto-sync
Bulk uploadFolders & zips
Harbour Link Metro · Package 3
18,240 documents understood
Live sync
DWG
GA-104_RevC.dwg
Rev C against Rev B · 3 changed areas
Understood
XLSX
Programme_Update_R7.xlsx
412 activities · 3 now on the critical path
Understood
JPG
Site_Diary_12-Mar.jpg
Handwritten · “No access to grid C, crane down”
Understood
PDF
ENG-L118_Notice_of_Delay.pdf
Notice of delay · 28-day window from 3 Mar
Understood
Know every contract inside out
Book a demo to see Infiny on documents like yours.